DolcePack holds US, EU, UK and Swiss patents on the rotary filling mechanism. References: EP4281377 ยท US12384581B2
| โ | Intermittent rotary | Maximum output per square metre of floor space |
| โ | Multi-dosing ready | MHW, auger, liquid dosers โ all native integration |
| โ | Pouch formats | Doypack, 3-side seal, zipper, shaped, side gusset, corner spout |
| โ | Special closures | Zipper, corner spout, EURO hole |
| โ | Sprint changeover | Quick-lock parts โ format change in under 4 minutes |
| โ | Weigher integration | Pre-disposed for 8 MHW brands |
| โ | Auger compatible | Simple adaptor frame required |
| โ | Contract packaging | Multi-customer operation ready |
REVO vs COMBI Sprint vs VFFS comes down to SKU count and target throughput. We've mapped 80+ lines. Let us map yours.
| Criterion | โ REVO | โก COMBI Sprint | VFFS โ DolcePack Integrated |
|---|---|---|---|
| Max throughput | Up to 50 ppm | Up to 20 ppm | Up to 120 ppm |
| Format changeover | <7 min | <4 min | approx. 20โ30 min |
| MHW integration | โ 8 brands | โ 8 brands | โ 8 brands |
| Zipper / re-close | โ Built-in | โ Built-in | โ Add-on required |
| High-SKU lines | โ Designed for this | โ Designed for this | โ One film roll per format |
| Rigid containers | โ | โ | โ Also integrated by DolcePack |
| Patent | US ยท EU ยท CH ยท UK 2025 | Patent Pending | OEM โ DolcePack advisory |
| Best fit | Space-tight, high throughput | High format variability, contract packing | Single format, max speed, high volume |
The machine is only half the answer. The right weigher-to-machine combination determines OEE, accuracy, and total cost.




Choose REVO when your priority is maximising output in the smallest possible footprint. Ideal for facilities with limited space or high throughput requirements.
Choose COMBI Sprint when you need to run many SKU formats with fast, fluid changeovers โ the better choice for flexible production and private label lines.
Yes, if you have a dosing system in use, we can integrate into our packaging lines. It is always important to understand the dosing system to correctly integrate and prepare for the mechanical integration and interface between the two machines.
3 side-seal, Stand-up Doypacks, Square Bottom and Side Gusset pouches. With or without zipper. Also paper and recyclable materials as long as there is a heat sealable layer.
It varies based on project complexity, but at least 1 week is necessary for install and training to take place.
It is best to give various solutions to customers. Through our experience we have noticed not all projects are created equally. Giving various solutions allows for the best fit with the project and overall expectations.
This depends on many factors and is best analyzed on a case by case basis. Contact us and we can help guide you to the right solution.
Contact us with your project info!
